All rooms are fully boarded in preparation for the plaster to be applied. We started this on the top floor then moved onto the ground floor.
The client also requested that in the dining room there would be a recess added for either a mirror or a tv to be hung. While the rooms were being boarded this was the perfect opportunity to install this.
Once this has been completed we can start plastering the rooms. We started this process on the top floor with both the bedrooms and the bathroom.
At this point we also started to discuss paint colours with our client in preparation for the next stage of the refurb.
Check back for next week's blog post which will show the ground floor plastered and the top floor being painted in it's final colour!